Thursday 12 March 2020

New bathroom and other decorating.

So the upstairs bathroom is ready to be installed next week. Due to the radiators being installed and having to drain the system this has inadvertently meant that the utility room will be decorated (Marvel comic strip wallpaper) and the bedroom painted. I do like it when lots of things happen at once.
Once the bathroom is installed we have a damp issue downstairs to fix which means the original bathroom and kitchen needs to be taken apart then we can get our new kitchen!
By the end of summer our house will be PERFECT.

The only issue is that now recording videos is on hold until the work is done due to mess/noise/men wondering around.

I will still be taking phone calls and taking cam sessions as and when I can minimum 30hrs a week possibly more.